1
/
of
9
Northio
Rattan Sun Lounger with Cushion, Ergonomic S-Curve, 195 cm
Rattan Sun Lounger with Cushion, Ergonomic S-Curve, 195 cm
Regular price
€334,99 EUR
Regular price
€368,99 EUR
Sale price
€334,99 EUR
Unit price
/
per
Taxes included.
Shipping calculated at checkout.
Couldn't load pickup availability
The Poly Rattan Sun Lounger offers ergonomic comfort with its S-shaped design, providing a relaxing outdoor experience. Its breathable rattan weave ensures a cool, comfortable lounging space for reading or sunbathing.
- Experience full-body comfort with the ergonomic S-shaped sun lounger.
- Enjoy breathable use with 4 mm round rattan weave, even without cushions.
- Enhance comfort with a 195 cm long foam cushion for added support.
- Keep cushions secure with slip-resistant covers and ties.
- Rely on a powder-coated steel frame for durability and rust resistance.
Transform your outdoor space into a personal retreat with this stylish and functional sun lounger. Its sturdy construction and elegant design make it a must-have for any garden or patio. Grab yours today.
Specifications
- Color: Cream White, Natural, Black
- Material: PE Rattan, Steel, Polyester, Foam
- Dimensions: 57W x 175D x 80H cm
- Seat Size: 57W x 128D cm
- Seat Height: 32 cm
- Backrest: 70L x 57W cm
- Cushion Size: 195L x 58W x 3H cm
- Max Load: 120 kg
Share
